Productivity Tracker

A Single Number That Cuts Through "I Was Busy All Day"

Feeling busy and actually finishing what you planned are two different things, and it's easy to confuse them at the end of a long day. Task completion rate strips out the noise by comparing what you set out to do against what actually got crossed off, turning a vague sense of productivity into a specific percentage you can track over time.

The Formula

Completion Rate = (Tasks Completed ÷ Tasks Planned) × 100

The result is expressed as a percentage. A rate above 100% isn't possible under this formula unless more tasks were completed than were planned for the period, which would suggest the plan itself was set too conservatively.

Where Tracking This Pays Off

  • Daily planning calibration — a completion rate that consistently lands under 60% signals you're planning more than is realistically achievable, not that you're underperforming.
  • Team standups — reporting a completion percentage instead of a task list gives a quick, comparable signal across sprints or weeks.
  • Habit and goal tracking — the same formula works for weekly goals, workout plans, or study sessions, not just work tasks.
Completion rate by tasks completed vs. planned
Tasks completedTasks plannedCompletion rate
55100%
81080%
152075%
31225%

Computed directly from the formula above.

How to Use This Calculator

  1. Enter the number of Tasks Completed for the period you're tracking.
  2. Enter the number of Tasks Planned for the same period.
  3. Select Calculate to see the completion rate as a percentage.

Related Calculations

Pair this with the Focus Score Calculator to see whether low completion rates trace back to distracted work time, or the Daily Output Calculator to track raw output instead of task counts.